PROJECTEDProjected — the official bulletin has not been published yet. We will update this page on release.
Historical movement scenario — not a probability interval and not a prediction. Actual dates may fall outside this range in either direction, including through retrogression or a category becoming unavailable.
The newest bulletin the Department of State has published is November 2026. Every figure below in an amber column is this site’s arithmetic over the published archive, shown as a range with its method and sample size. None of it is a government figure. This page becomes the official December 2026 bulletin page, at this same address, on release.
December 2026 visa bulletin: projected India EB-1, EB-2 and EB-3 movement
Projected India EB-2 final action: 1 Nov 2013 – 2 Jan 2014, from a published November 2026 cutoff of Nov 1, 2013. EB-3: 22 Jan 2014 – 22 Feb 2014. EB-1: 1 Feb 2023 – 21 May 2023. Ranges, not dates — December 2026 is 1 bulletin beyond the last published one, and the floor of every range is no movement. Across 5 Decembers in the archive it advanced in 3, held still in 1, went backwards in 1. The median December advance, counting only the months it moved, is 44 days.
- EB-1 Indiaprojected1 Feb 2023 – 21 May 2023from Feb 1, 2023 · n=12
- EB-2 Indiaprojected1 Nov 2013 – 2 Jan 2014from Nov 1, 2013 · n=8
- EB-3 Indiaprojected22 Jan 2014 – 22 Feb 2014from Jan 22, 2014 · n=12
- Chart USCIS acceptsNot determined for December 2026Tracked determination covers November 2026
Informational only, not legal advice. This page explains how a government process works and what the published rules say. It is not legal advice, and reading it does not create an attorney–client relationship. For advice on your own facts, speak to a licensed immigration attorney — here is what one typically costs.
Twelve published bulletins, and where the projection starts
Solid lines are published cutoffs. The shaded band to the right of the dashed line is the projected range for December 2026. A gap in a line is a month the category was Current or Unavailable — states rather than dates, and excluded from the arithmetic entirely.
data/visa-bulletin/, which is derived from the official Department of State bulletins. The band to the right of the dashed line is this site’s projection, not a published figure.The method, stated
Every prediction page we checked asserts movement without stating a basis. Here is ours, and it is derived in code from the snapshot archive rather than typed into copy, so it cannot quietly go stale. It is also worth being plain about what it is not: Historical movement scenario — not a probability interval and not a prediction. Actual dates may fall outside this range in either direction, including through retrogression or a category becoming unavailable. The sample is about a dozen month-over-month observations per row, the upper bound is a compounded historical percentile rather than a fitted model, the lower bound is a choice, and nothing here has been back-tested against how these pages would have performed in prior years.
| Category | Sample | Basis depth | How this range was built |
|---|---|---|---|
| EB-1 India | 12 pairs0 excluded as C or U | Full window | For December 2026, 1 bulletin out: 109 days of 75th-percentile historical advance per bulletin, compounded to 109 days and applied to the published November 2026 cutoff of 1 Feb 2023, giving 1 Feb 2023 – 21 May 2023. That rests on 12 comparable month-over-month pairs in the trailing 12 bulletins — 5 advanced, 5 held still, 2 went backwards — which is a dozen observations, not a statistical sample. Note that the backwards months are excluded from the band shown: the floor is no movement, so the band cannot express the retrogression this row has actually had.This row has moved backwards or become unavailable inside the trailing 12 bulletins (2 months of retrogression). A range with a floor of "no movement" does not capture that. Retrogression and a category going Unavailable are both live possibilities, and neither is forecastable from a trend. |
| EB-2 India | 8 pairs4 excluded as C or U | Full window | For December 2026, 1 bulletin out: 62 days of 75th-percentile historical advance per bulletin, compounded to 62 days and applied to the published November 2026 cutoff of 1 Nov 2013, giving 1 Nov 2013 – 2 Jan 2014. That rests on 8 comparable month-over-month pairs in the trailing 12 bulletins — 4 advanced, 3 held still, 1 went backwards, and 4 were Current or Unavailable and so excluded — which is a dozen observations, not a statistical sample. Note that the backwards months are excluded from the band shown: the floor is no movement, so the band cannot express the retrogression this row has actually had.This row has moved backwards or become unavailable inside the trailing 12 bulletins (1 month of retrogression) and (4 months Current or Unavailable). A range with a floor of "no movement" does not capture that. Retrogression and a category going Unavailable are both live possibilities, and neither is forecastable from a trend. |
| EB-3 India | 12 pairs0 excluded as C or U | Full window | For December 2026, 1 bulletin out: 31 days of 75th-percentile historical advance per bulletin, compounded to 31 days and applied to the published November 2026 cutoff of 22 Jan 2014, giving 22 Jan 2014 – 22 Feb 2014. That rests on 12 comparable month-over-month pairs in the trailing 12 bulletins — 5 advanced, 7 held still — which is a dozen observations, not a statistical sample. The floor is no movement, so the band cannot express retrogression. |
| EB-3 Other Workers India | 12 pairs0 excluded as C or U | Full window | For December 2026, 1 bulletin out: 31 days of 75th-percentile historical advance per bulletin, compounded to 31 days and applied to the published November 2026 cutoff of 22 Jan 2014, giving 22 Jan 2014 – 22 Feb 2014. That rests on 12 comparable month-over-month pairs in the trailing 12 bulletins — 5 advanced, 7 held still — which is a dozen observations, not a statistical sample. The floor is no movement, so the band cannot express retrogression. |
| EB-4 India | 12 pairs0 excluded as C or U | Full window | For December 2026, 1 bulletin out: 195 days of 75th-percentile historical advance per bulletin, compounded to 195 days and applied to the published November 2026 cutoff of 15 Dec 2022, giving 15 Dec 2022 – 28 Jun 2023. That rests on 12 comparable month-over-month pairs in the trailing 12 bulletins — 7 advanced, 5 held still — which is a dozen observations, not a statistical sample. The floor is no movement, so the band cannot express retrogression. |
| EB-5 Unreserved India | 8 pairs4 excluded as C or U | Full window | For December 2026, 1 bulletin out: 304 days of 75th-percentile historical advance per bulletin, compounded to 304 days and applied to the published November 2026 cutoff of 1 Dec 2023, giving 1 Dec 2023 – 30 Sep 2024. That rests on 8 comparable month-over-month pairs in the trailing 12 bulletins — 2 advanced, 6 held still, and 4 were Current or Unavailable and so excluded — which is a dozen observations, not a statistical sample. The floor is no movement, so the band cannot express retrogression.This row has moved backwards or become unavailable inside the trailing 12 bulletins (4 months Current or Unavailable). A range with a floor of "no movement" does not capture that. Retrogression and a category going Unavailable are both live possibilities, and neither is forecastable from a trend. |
Where December 2026 sits in the fiscal year — month 3 of FY2027
December is where the archive says this series actually moves, and where its only reversal sits. India EB-2 final action changed in four of the last five Decembers — and one of those four went backwards, in December 2022. That combination is what makes December the least predictable of the three months: the base rate of movement is high and the direction is not guaranteed. By December the fiscal year's first quarter of demand is also behind the Department of State, which is the first point at which its own issuance data can inform a cutoff rather than a prior-year pattern.
What the projection is NOT anchored on
The supply side. The employment-based pool each year is the 140,000 statutory floor plus family-sponsored numbers unused in the prior year, and that fall-up is not knowable in advance. DOS has not published the FY2027 figure — our own annual-limits data records it as awaiting publication, and not yet published. DOS states the year's employment-based limit in the Visa Bulletin after the fiscal year opens on October 1; until then the 140,000 floor is the only figure with statutory backing. Any page quoting a specific FY2027 total is quoting an estimate. How the annual limits work has the statutory arithmetic.
Which chart applies in December 2026?
Nobody knows yet, including us
USCIS decides month by month whether adjustment-of-status applicants may use the Dates for Filing chart or must use Final Action Dates, and it publishes that determination separately from the bulletin. The determination this site tracks covers November 2026, where the answer is: Dates for Filing. That is a different month from December 2026, and asserting it for December 2026 is exactly the mistake that gets an I-485 rejected rather than held. Confirm at uscis.gov/visabulletininfo before you file.
The determination can also differ between employment-based and family-sponsored cases in the same month, which is a second reason not to read one answer off the other. Final action dates versus dates for filing explains what the two charts control.
Check your priority date against the published bulletin
The same checker that runs on /tools/priority-date-checker. It reads the published November 2026 cutoffs, not the projections on this page — deliberately, because a checker that told you where you stood against a forecast would be worse than useless. Nothing is stored.
Priority Date Checker
Where does your priority date stand?
Compare your priority date against the November 2026 visa bulletin data.
Bulletin data last updated: 2026-10-23 · Source: official visa bulletin
Employment-based: every category and country
The two amber columns are scenarios. The two plain columns are the published November 2026 figures they are built from. India rows are highlighted. Historical movement scenario — not a probability interval and not a prediction. Actual dates may fall outside this range in either direction, including through retrogression or a category becoming unavailable.
| Category | Country | Last publishedNovember 2026, official | Scenariofinal action — not official, not a probability interval | Last publisheddates for filing | Scenariodates for filing — not official, not a probability interval |
|---|---|---|---|---|---|
| EB-1 | India | Feb 1, 2023 | 1 Feb 2023 – 21 May 2023up to 109 days of movement | Jul 1, 2024 | 1 Jul 2024 – 30 Jan 2025up to 213 days of movement |
| EB-1 | China (mainland) | Aug 1, 2023 | 1 Aug 2023 – 1 Sep 2023up to 31 days of movement | Jul 1, 2024 | 1 Jul 2024 – 30 Jan 2025up to 213 days of movement |
| EB-1 | Mexico | Current | Currenta state, not a date | Current | Currenta state, not a date |
| EB-1 | Philippines | Current | Currenta state, not a date | Current | Currenta state, not a date |
| EB-1 | All other countries | Current | Currenta state, not a date | Current | Currenta state, not a date |
| EB-2 | India | Nov 1, 2013 | 1 Nov 2013 – 2 Jan 2014up to 62 days of movement | Jan 15, 2015 | 15 Jan 2015 – 16 Dec 2015up to 335 days of movement |
| EB-2 | China (mainland) | Oct 1, 2021 | 1 Oct 2021 – 1 Jan 2022up to 92 days of movement | Jan 1, 2023 | 1 Jan 2023 – 1 Jan 2024up to 365 days of movement |
| EB-2 | Mexico | Apr 1, 2025 | 1 Apr 2025 – 30 Jun 2025up to 90 days of movement | Mar 15, 2026 | 15 Mar 2026 – 15 Jun 2026up to 92 days of movement |
| EB-2 | Philippines | Apr 1, 2025 | 1 Apr 2025 – 30 Jun 2025up to 90 days of movement | Mar 15, 2026 | 15 Mar 2026 – 15 Jun 2026up to 92 days of movement |
| EB-2 | All other countries | Apr 1, 2025 | 1 Apr 2025 – 30 Jun 2025up to 90 days of movement | Mar 15, 2026 | 15 Mar 2026 – 15 Jun 2026up to 92 days of movement |
| EB-3 | India | Jan 22, 2014 | 22 Jan 2014 – 22 Feb 2014up to 31 days of movement | Jan 15, 2015 | 15 Jan 2015 – 17 Jun 2015up to 153 days of movement |
| EB-3 | China (mainland) | Jan 22, 2022 | 22 Jan 2022 – 8 Mar 2022up to 45 days of movement | Apr 1, 2024 | 1 Apr 2024 – 24 Jun 2026up to 814 days of movement |
| EB-3 | Mexico | Jun 15, 2024 | 15 Jun 2024 – 15 Aug 2024up to 61 days of movement | Aug 1, 2024 | 1 Aug 2024 – 15 Nov 2024up to 106 days of movement |
| EB-3 | Philippines | Aug 15, 2023 | 15 Aug 2023 – 24 Sep 2023up to 40 days of movement | Jan 1, 2024 | 1 Jan 2024 – 2 Apr 2024up to 92 days of movement |
| EB-3 | All other countries | Jun 15, 2024 | 15 Jun 2024 – 15 Aug 2024up to 61 days of movement | Aug 1, 2024 | 1 Aug 2024 – 15 Nov 2024up to 106 days of movement |
| EB-3 Other Workers | India | Jan 22, 2014 | 22 Jan 2014 – 22 Feb 2014up to 31 days of movement | Jan 15, 2015 | 15 Jan 2015 – 17 Jun 2015up to 153 days of movement |
| EB-3 Other Workers | China (mainland) | Oct 1, 2019 | 1 Oct 2019 – 2 Mar 2020up to 153 days of movement | Oct 1, 2020 | 1 Oct 2020 – 2 Oct 2021up to 366 days of movement |
| EB-3 Other Workers | Mexico | Jun 1, 2022 | 1 Jun 2022 – 1 Sep 2022up to 92 days of movement | Jul 1, 2022 | 1 Jul 2022 – 20 Jan 2023up to 203 days of movement |
| EB-3 Other Workers | Philippines | Jan 1, 2022 | 1 Jan 2022 – 1 Feb 2022up to 31 days of movement | Jun 1, 2022 | 1 Jun 2022 – 21 Dec 2022up to 203 days of movement |
| EB-3 Other Workers | All other countries | Jun 1, 2022 | 1 Jun 2022 – 1 Sep 2022up to 92 days of movement | Jul 1, 2022 | 1 Jul 2022 – 20 Jan 2023up to 203 days of movement |
| EB-4 | India | Dec 15, 2022 | 15 Dec 2022 – 28 Jun 2023up to 195 days of movement | Jan 1, 2025 | 1 Jan 2025 – 1 Dec 2026, or Currentup to 731 days of movement |
| EB-4 | China (mainland) | Dec 15, 2022 | 15 Dec 2022 – 28 Jun 2023up to 195 days of movement | Jan 1, 2025 | 1 Jan 2025 – 1 Dec 2026, or Currentup to 731 days of movement |
| EB-4 | Mexico | Dec 15, 2022 | 15 Dec 2022 – 28 Jun 2023up to 195 days of movement | Jan 1, 2025 | 1 Jan 2025 – 1 Dec 2026, or Currentup to 731 days of movement |
| EB-4 | Philippines | Dec 15, 2022 | 15 Dec 2022 – 28 Jun 2023up to 195 days of movement | Jan 1, 2025 | 1 Jan 2025 – 1 Dec 2026, or Currentup to 731 days of movement |
| EB-4 | All other countries | Dec 15, 2022 | 15 Dec 2022 – 28 Jun 2023up to 195 days of movement | Jan 1, 2025 | 1 Jan 2025 – 1 Dec 2026, or Currentup to 731 days of movement |
| EB-5 Unreserved | India | Dec 1, 2023 | 1 Dec 2023 – 30 Sep 2024up to 304 days of movement | May 1, 2024 | 1 May 2024 – 1 Jun 2026up to 761 days of movement |
| EB-5 Unreserved | China (mainland) | Dec 1, 2016 | 1 Dec 2016 – 9 Feb 2017up to 70 days of movement | Mar 1, 2021 | 1 Mar 2021 – 30 Jul 2021up to 151 days of movement |
| EB-5 Unreserved | Mexico | Current | Currenta state, not a date | Current | Currenta state, not a date |
| EB-5 Unreserved | Philippines | Current | Currenta state, not a date | Current | Currenta state, not a date |
| EB-5 Unreserved | All other countries | Current | Currenta state, not a date | Current | Currenta state, not a date |
Family-sponsored: every category and country
Family-sponsored cases have their own USCIS chart determination, which is often different from the employment-based one in the same month.
| Category | Country | Last publishedNovember 2026, official | Scenariofinal action — not official, not a probability interval | Last publisheddates for filing | Scenariodates for filing — not official, not a probability interval |
|---|---|---|---|---|---|
| F1 | India | Jan 22, 2021 | 22 Jan 2021 – 23 Jan 2022up to 366 days of movement | Feb 1, 2021 | 1 Feb 2021 – 20 Sep 2021up to 231 days of movement |
| F1 | China (mainland) | Jan 22, 2021 | 22 Jan 2021 – 23 Jan 2022up to 366 days of movement | Feb 1, 2021 | 1 Feb 2021 – 20 Sep 2021up to 231 days of movement |
| F1 | Mexico | Sep 22, 2008 | 22 Sep 2008 – 22 Mar 2009up to 181 days of movement | Dec 1, 2008 | 1 Dec 2008 – 19 May 2009up to 169 days of movement |
| F1 | Philippines | Nov 1, 2013 | 1 Nov 2013 – 4 May 2014up to 184 days of movement | Apr 22, 2015 | 22 Apr 2015 |
| F1 | All other countries | Jan 22, 2021 | 22 Jan 2021 – 23 Jan 2022up to 366 days of movement | Feb 1, 2021 | 1 Feb 2021 – 20 Sep 2021up to 231 days of movement |
| F2A | India | Oct 22, 2026 | 22 Oct 2026 – 1 Dec 2026, or Currentup to 182 days of movement | Current | Currenta state, not a date |
| F2A | China (mainland) | Oct 22, 2026 | 22 Oct 2026 – 1 Dec 2026, or Currentup to 182 days of movement | Current | Currenta state, not a date |
| F2A | Mexico | Apr 22, 2026 | 22 Apr 2026 – 20 Nov 2026up to 212 days of movement | Current | Currenta state, not a date |
| F2A | Philippines | Oct 22, 2026 | 22 Oct 2026 – 1 Dec 2026, or Currentup to 182 days of movement | Current | Currenta state, not a date |
| F2A | All other countries | Oct 22, 2026 | 22 Oct 2026 – 1 Dec 2026, or Currentup to 182 days of movement | Current | Currenta state, not a date |
| F2B | India | Aug 22, 2020 | 22 Aug 2020 – 23 Aug 2021up to 366 days of movement | Sep 1, 2020 | 1 Sep 2020 – 27 Mar 2021up to 207 days of movement |
| F2B | China (mainland) | Aug 22, 2020 | 22 Aug 2020 – 23 Aug 2021up to 366 days of movement | Sep 1, 2020 | 1 Sep 2020 – 27 Mar 2021up to 207 days of movement |
| F2B | Mexico | May 15, 2010 | 15 May 2010 – 15 Nov 2010up to 184 days of movement | Mar 22, 2011 | 22 Mar 2011 – 22 Sep 2011up to 184 days of movement |
| F2B | Philippines | Oct 1, 2013 | 1 Oct 2013 – 16 Jan 2014up to 107 days of movement | Oct 1, 2014 | 1 Oct 2014 – 1 Oct 2015up to 365 days of movement |
| F2B | All other countries | Aug 22, 2020 | 22 Aug 2020 – 23 Aug 2021up to 366 days of movement | Sep 1, 2020 | 1 Sep 2020 – 27 Mar 2021up to 207 days of movement |
| F3 | India | Oct 22, 2015 | 22 Oct 2015 – 21 Oct 2016up to 365 days of movement | Nov 1, 2015 | 1 Nov 2015 – 31 Oct 2016up to 365 days of movement |
| F3 | China (mainland) | Oct 22, 2015 | 22 Oct 2015 – 21 Oct 2016up to 365 days of movement | Nov 1, 2015 | 1 Nov 2015 – 31 Oct 2016up to 365 days of movement |
| F3 | Mexico | Jul 15, 2001 | 15 Jul 2001 – 15 Aug 2001up to 31 days of movement | Dec 1, 2002 | 1 Dec 2002 – 18 Apr 2004up to 504 days of movement |
| F3 | Philippines | Jul 22, 2006 | 22 Jul 2006 – 13 Dec 2006up to 144 days of movement | Oct 22, 2006 | 22 Oct 2006 – 22 Jan 2007up to 92 days of movement |
| F3 | All other countries | Oct 22, 2015 | 22 Oct 2015 – 21 Oct 2016up to 365 days of movement | Nov 1, 2015 | 1 Nov 2015 – 31 Oct 2016up to 365 days of movement |
| F4 | India | Dec 15, 2006 | 15 Dec 2006 – 28 Jan 2007up to 44 days of movement | Feb 1, 2007 | 1 Feb 2007 – 21 Mar 2007up to 48 days of movement |
| F4 | China (mainland) | Oct 22, 2012 | 22 Oct 2012 – 23 Oct 2013up to 366 days of movement | Nov 1, 2012 | 1 Nov 2012 – 2 Nov 2013up to 366 days of movement |
| F4 | Mexico | Apr 22, 2001 | 22 Apr 2001 – 6 May 2001up to 14 days of movement | Apr 30, 2001 | 30 Apr 2001 |
| F4 | Philippines | May 15, 2008 | 15 May 2008 – 15 Oct 2008up to 153 days of movement | Mar 22, 2009 | 22 Mar 2009 – 22 Mar 2010up to 365 days of movement |
| F4 | All other countries | Oct 22, 2012 | 22 Oct 2012 – 23 Oct 2013up to 366 days of movement | Nov 1, 2012 | 1 Nov 2012 – 2 Nov 2013up to 366 days of movement |
What is specific about a December bulletin
December is where the archive says this series actually moves, and where its only reversal sits. India EB-2 final action changed in four of the last five Decembers — and one of those four went backwards, in December 2022. That combination is what makes December the least predictable of the three months: the base rate of movement is high and the direction is not guaranteed. By December the fiscal year's first quarter of demand is also behind the Department of State, which is the first point at which its own issuance data can inform a cutoff rather than a prior-year pattern.
That is not a forecast, it is a base rate, and it is the part of this page that could not be written about any other month. The three India EB categories have behaved differently in a December too, so here is each of them across every December in the archive:
EB-1 India in a December
Across 5 Decembers in the archive it advanced in 1, held still in 2, was Current or Unavailable in 2. The median December advance, counting only the months it moved, is 28 days.
EB-2 India in a December
Across 5 Decembers in the archive it advanced in 3, held still in 1, went backwards in 1. The median December advance, counting only the months it moved, is 44 days.
EB-3 India in a December
Across 5 Decembers in the archive it advanced in 3, held still in 2. The median December advance, counting only the months it moved, is 31 days.
data/visa-bulletin/, derived from the official Department of State bulletins. Months the category was Current or Unavailable are shown as state changes rather than as a number of days, because they are states and not dates.EB-1 India — final action, every December
| December | From | To | What happened |
|---|---|---|---|
| December 2021 | Current | Current | became current |
| December 2022 | Current | Current | became current |
| December 2023 | Jan 1, 2017 | Jan 1, 2017 | no movement |
| December 2024 | Feb 1, 2022 | Feb 1, 2022 | no movement |
| December 2025 | Feb 15, 2022 | Mar 15, 2022 | advanced 28 days |
EB-2 India — final action, every December
| December | From | To | What happened |
|---|---|---|---|
| December 2021 | Dec 1, 2011 | May 1, 2012 | advanced 152 days |
| December 2022 | Apr 1, 2012 | Oct 8, 2011 | retrogressed 176 days |
| December 2023 | Jan 1, 2012 | Jan 1, 2012 | no movement |
| December 2024 | Jul 15, 2012 | Aug 1, 2012 | advanced 17 days |
| December 2025 | Apr 1, 2013 | May 15, 2013 | advanced 44 days |
EB-3 India — final action, every December
| December | From | To | What happened |
|---|---|---|---|
| December 2021 | Jan 15, 2012 | Jan 15, 2012 | no movement |
| December 2022 | Apr 1, 2012 | Jun 15, 2012 | advanced 75 days |
| December 2023 | May 1, 2012 | May 1, 2012 | no movement |
| December 2024 | Nov 1, 2012 | Nov 8, 2012 | advanced 7 days |
| December 2025 | Aug 22, 2013 | Sep 22, 2013 | advanced 31 days |
Final action dates only, one row per year in the archive. Source: the snapshot archive in data/visa-bulletin/, derived cell by cell from the official Department of State bulletins. A month the category was Current or Unavailable is shown as a state change rather than as a number of days.
What to do in December 2026
If a date is current and you can file, file. December and January are also when USCIS office workloads shift around the holidays, so a package that goes in early in the month is not competing with the same queue as one that goes in at the end of it. If your date is close rather than current, this is the month to have everything assembled, because a two-month advance in December would reach dates a November advance would not.
How much weight this projection deserves
Two bulletins past the last published one, so the range is roughly twice as wide as November's and deserves proportionately less weight. Two months of compounding is also where a projection built on a median advance diverges most from reality, in either direction.
What this would mean for you
Four worked cases against the ranges above. Each one assumes the projection lands somewhere inside its band, which is an assumption and not a forecast — and the weight that assumption deserves in December 2026 specifically is two bulletins past the last published one, so the range is roughly twice as wide as November's and deserves proportionately less weight. Two months of compounding is also where a projection built on a median advance diverges most from reality, in either direction.
| Your situation | Against the projected range | What to actually do |
|---|---|---|
| EB-2 India, priority date in 2015 | The projected final action range tops out at Jan 2, 2014, so a 2015 date is not reached in December 2026 on any point in this band. | Dates for Filing is the chart that matters to you first — check whether your date is current on it, because that is what lets you file the I-485 package with the EAD and advance parole. |
| EB-2 India, priority date in late 2013 | This is the live edge of the range: the floor is Nov 1, 2013 and the ceiling Jan 2, 2014. | If a date is current and you can file, file. December and January are also when USCIS office workloads shift around the holidays, so a package that goes in early in the month is not competing with the same queue as one that goes in at the end of it. If your date is close rather than current, this is the month to have everything assembled, because a two-month advance in December would reach dates a November advance would not. |
| EB-3 India, considering a downgrade from EB-2 | Projected EB-3 22 Jan 2014 – 22 Feb 2014 against EB-2 1 Nov 2013 – 2 Jan 2014. Compare the floors, not the ceilings. | A downgrade is a strategy with real costs and a dependence on which chart USCIS accepts. Read the downgrade guide before acting on one month's movement. |
| EB-1 India, I-140 approved | Projected 1 Feb 2023 – 21 May 2023, from Feb 1, 2023. | EB-1 India has both advanced and retrogressed inside the last twelve bulletins, which is why its downside note is on this page. Watch the trend across the chart rather than the single month. |
The explainers, which this page deliberately does not repeat
A monthly page is for that month’s figures. Everything structural is owned elsewhere on this site and kept in one place, so it stays right.
- What a priority date is, and when yours was set →
- Final action dates vs dates for filing →
- What retrogression actually does →
- How the annual and per-country limits work →
- EB-1 India — cutoffs and outlook →
- EB-2 India — cutoffs and outlook →
- EB-3 India — cutoffs and outlook →
- EB-2 to EB-3 downgrade →
- How long the India backlog really is →
- Where you are in the queue →
Other months
Published bulletins carry real figures. Projected months carry ranges.
Projected
The monthly update hub carries the full index, and the visa bulletin guide is the place to start if this is your first month reading one.
Frequently asked questions
Has the December 2026 visa bulletin been published?
Not when this page was last updated. The latest bulletin the Department of State has published is November 2026. DOS normally releases the next month's bulletin in the second or third week of the preceding month. Everything on this page below the banner is a projection built from the published archive, not a published figure — and this page becomes the official December 2026 bulletin page, at this same URL, on release.
What are the projected India EB dates for December 2026?
EB-2 India final action is projected at 1 Nov 2013 – 2 Jan 2014, from a published November 2026 cutoff of Nov 1, 2013. EB-3 India is projected at 22 Jan 2014 – 22 Feb 2014. EB-1 India is projected at 1 Feb 2023 – 21 May 2023. These are ranges rather than dates, their floor is no movement, and they are this site's arithmetic rather than a government figure. Verify against the Department of State once the bulletin is out.
Does December 2026 usually move?
Across 5 Decembers in the archive it advanced in 3, held still in 1, went backwards in 1. The median December advance, counting only the months it moved, is 44 days. December is where the archive says this series actually moves, and where its only reversal sits. India EB-2 final action changed in four of the last five Decembers — and one of those four went backwards, in December 2022. That combination is what makes December the least predictable of the three months: the base rate of movement is high and the direction is not guaranteed. By December the fiscal year's first quarter of demand is also behind the Department of State, which is the first point at which its own issuance data can inform a cutoff rather than a prior-year pattern. That is a base rate from the archive rather than a forecast, and it is the most useful single thing to know about a December bulletin before the figures arrive.
What should I be doing in December 2026?
If a date is current and you can file, file. December and January are also when USCIS office workloads shift around the holidays, so a package that goes in early in the month is not competing with the same queue as one that goes in at the end of it. If your date is close rather than current, this is the month to have everything assembled, because a two-month advance in December would reach dates a November advance would not.
How much weight does a December 2026 projection deserve?
Two bulletins past the last published one, so the range is roughly twice as wide as November's and deserves proportionately less weight. Two months of compounding is also where a projection built on a median advance diverges most from reality, in either direction.
How is the scenario calculated, and how much should I trust it?
From the site's own snapshot archive of published bulletins. For each category and country we take the month-over-month change in the cutoff across the trailing 12 bulletins, excluding every month the category was Current or Unavailable — those are states rather than dates, and treating "U" as an old date is how movement trackers produce a confident "retrogressed 4,000 days". The low bound is no movement, which is the most common single outcome in the archive. The high bound applies the 75th-percentile observed advance per bulletin across the horizon, then holds it at the bulletin's own month, because a cutoff that reaches the present means there is no queue left. On how much to trust it: Historical movement scenario — not a probability interval and not a prediction. Actual dates may fall outside this range in either direction, including through retrogression or a category becoming unavailable. Each row rests on roughly a dozen observations, the bounds are chosen rather than fitted, and the method has not been back-tested. Treat it as "here is what this row has done recently, applied forward", not as a forecast with a known error rate.
What is the FY2027 annual limit?
The Department of State has not published it. The statutory floor for the worldwide employment-based level is 140,000 under INA 201(d)(1)(A), and the per-country ceiling is 7% of the year's total under INA 202(a)(2) — but the actual pool is the floor plus family-sponsored numbers unused in the prior year, which is not knowable in advance. Any page quoting a specific FY2027 employment-based total is quoting an estimate. That is also why these projections are not anchored on a supply figure.
Why is this page at a clean URL instead of a predictions URL?
Because the URL is the month, and the month does not change when the bulletin is published — only the page's status does. Putting a forecast word in the path would mean moving the page later, splitting the links and the history across two URLs for no reason. Each of these pages carries a projected status today and becomes the official bulletin page for its month at that same address on release.
What is the difference between final action dates and dates for filing?
Dates for Filing is the earlier of the two charts and controls when you may submit an I-485, along with the EAD and advance parole applications that go with it. Final Action Dates is the later chart and controls when a green card can actually be approved and a visa number issued. Being current on Dates for Filing gets you a work permit and a travel document; only Final Action ends the wait.
Which chart will USCIS accept for filing in December 2026?
We do not know, and no honest page can tell you. USCIS makes that determination month by month and publishes it separately from the bulletin. The determination tracked site-wide covers November 2026, where the answer is: Dates for Filing. That is a different month from this one. Check uscis.gov/visabulletininfo before you file — using the wrong chart gets an I-485 rejected rather than held.
Could the dates retrogress in December 2026 instead?
Yes, and the ranges on this page do not capture it — a range with a floor of "no movement" cannot. December is where the archive says this series actually moves, and where its only reversal sits. India EB-2 final action changed in four of the last five Decembers — and one of those four went backwards, in December 2022. That combination is what makes December the least predictable of the three months: the base rate of movement is high and the direction is not guaranteed. By December the fiscal year's first quarter of demand is also behind the Department of State, which is the first point at which its own issuance data can inform a cutoff rather than a prior-year pattern. India EB-2 is the live example from the last fiscal year: it advanced to 15 July 2014 by April 2026, retrogressed in June, and went Unavailable from July through September before resetting at 1 November 2013 in the October 2026 bulletin. Retrogression and a category going Unavailable are both real possibilities and neither is forecastable from a trend.
Sources, method and status
The December 2026 bulletin has not been published. Every published figure on this page comes from the November 2026 bulletin via the snapshot archive in data/visa-bulletin/, which is derived cell by cell from the official Department of State bulletins. The projected ranges are this site's arithmetic over that archive, derived in code, with the sample size shown for every row. Verify against the Department of State on release.
Informational only, not legal advice. This page explains how a government process works and what the published rules say. It is not legal advice, and reading it does not create an attorney–client relationship. For advice on your own facts, speak to a licensed immigration attorney — here is what one typically costs.
Deepak Middha, CA, Series 65Founder & Author
Deepak has experience in cross-border finance, tax-aware planning, and immigrant money decisions. View full profile →
Educational content, not personalized tax, legal, immigration, or financial advice. Rules, fees, and processing times change — always verify with the official source before acting. See our full disclaimer.